OMS Implementation Playbook — Part 2

OMS Playbook Part 2: Chapters 6–9

The next four chapters in the OMS implementation sequence — free for anyone who downloaded Part 1 (Ch 1–5).

Based on real implementations — no vendor brochures.

If you've read Part 1 (Chapters 1–5 — download free at /playbook/sample), you know the terrain. Part 2 takes you from "we understand the control plane" to "we have a defensible selection rationale and a target operating model that's actually buildable."

These four chapters are where most implementations go wrong — not in execution, but in the discovery and requirements work that precedes it. Getting this wrong costs more than anything that happens during the build phase.

Part 1 and Part 2 together cover Parts I and II of the full six-part OMS Implementation Playbook. They are the front-end strategy, discovery, requirements, and vendor-selection framework — not the full implementation guide.

What's inside

Four chapters. No filler.

06

Current-State Assessment Methodology

A structured process for inventorying your firm's actual operational state before scoping implementation. Covers data quality, integration dependencies, team capacity, compliance infrastructure, and the difference between how processes are documented and how they actually work. Output: a gap matrix with prioritized remediation sequenced by implementation risk.

07

Requirements Engineering and Target Operating Model

How to write functional requirements that survive vendor demos and actually govern the build. Includes the TOM template used with buy-side clients — the difference between a requirements doc that gets ignored and one that shapes the contract and the SOW.

08

Vendor Evaluation and Selection

The evaluation methodology that prevents vendor steering and demo-driven scope creep. Covers how to structure evaluation criteria, weight by firm-specific priorities, score against actual requirements (not the demo deck), and build a selection rationale that holds up to board scrutiny and procurement pushback.

09

Wealth-Driven Workflow Extensions and Implementation-Ready Target State

How to extend the target state beyond institutional workflows into wealth-driven variants — the configuration space that separates a system that your ops team can actually run from one that requires constant workaround. Includes the workflow mapping template and the go/no-go criteria before implementation starts.

Continue the Playbook

You received Chapters 1–5 with Part 1. Part 2 extends the framework with Chapters 6–9:

Chapter Title What you get
6 Current-State Assessment Methodology Gap matrix, 8-dimension inventory, remediation sequencing by implementation risk
7 Requirements Engineering and Target Operating Model TOM template, requirements doc structure, board-ready selection rationale
8 Vendor Evaluation and Selection Weighted scoring framework, evaluation criteria structure, vendor-neutral methodology
9 Wealth-Driven Workflow Extensions and Implementation-Ready Target State Workflow mapping template, ops-team-usable target state, go/no-go criteria
Free for Part 1 owners

Already have Part 1 (Ch 1–5)?

Enter the email you used to download Part 1. We'll verify your access and unlock the free Part 2 download.

Full six-part Playbook

Part 2 is the bridge. The full Playbook is the operating manual.

Part 1 and Part 2 give you the strategy, discovery, requirements, and selection foundation. The complete OMS Implementation Playbook adds the later implementation lifecycle: governance, data architecture, compliance build, testing, migration, cutover, go-live control, and post-launch sustainment.

Part I: Strategic case and architecture lens Part II: Discovery, requirements, and vendor selection Part III: Governance, controls, and implementation design Part IV: Data, integration, compliance, and workflow build Part V: Testing, migration, cutover, and go-live readiness Part VI: Stabilization, optimization, and operating discipline
Purchase the complete OMS Playbook →
Questions

Frequently asked

Is this really free?

Yes — if you downloaded Part 1 (Chapters 1–5), access to Part 2 (Chapters 6–9) is included at no additional cost. Enter the same email you used for Part 1.

Do I need Part 1 first?

Yes. Part 2 builds on the baseline, terminology, and framework established in Chapters 1–5. Download Part 1 for free first, then come back here.

What if I don't have Part 1?

Get your free copy of the OMS Playbook Part 1 — Chapters 1–5 cover the control-plane doctrine, market taxonomy, and architecture decision frameworks. Then return here for Part 2.

Does Part 2 complete the OMS Playbook?

No. Part 2 closes the free front-end sequence only: Chapters 1–9 across Parts I and II. The full OMS Implementation Playbook includes all six parts and all 25 chapters.

What if I want all 25 chapters?

The full 25-chapter Playbook (Core Edition, $497) covers all six parts, including Chapters 1–9 plus the implementation, testing, cutover, and sustainment material that follows. Part 1 + Part 2 together cover Parts I and II only. If you want the complete work, see /products/playbook.

What format is the Part 2 PDF?

PDF, immediately downloadable after email verification. Same format and page quality as Part 1.

Ready to apply this with someone who's done it on both platforms?

Part 2 shows you what's possible. PBW engagements apply it directly to your firm's situation — current-state assessment, vendor evaluation, target operating model, implementation planning. If you're past the framework stage, that's where we work.

Book a 30-Minute Scope & Fit Call →