What is in the checklist
Most OMS implementations hit change orders because gaps were not surfaced before the SOW was signed. This checklist walks through every readiness domain — with specific items per area — so you know your position before the vendor kickoff.
Section 1
Workflow Readiness — Sample
- Order entry → allocation → confirmation → settlement workflow documented end-to-end
- Cross-asset workflow coverage confirmed: equities, fixed income, derivatives
- Exception types inventoried with ownership matrix and resolution SLAs
- Manual workaround inventory complete — decision made per workaround: automate, keep, defer
Section 2
Data Readiness — Sample
- Security master source confirmed with asset class and cross-reference field coverage
- SSI data complete and current for all active counterparties
- Historical migration scope defined: years, asset classes, tax lot history
Section 3
Compliance Readiness
- Pre-trade rule inventory complete with full rule specification per rule
- Concentration limit aggregation method specified and confirmed with compliance officer
- Breach escalation and evidence workflow documented per severity level
- Post-trade monitoring framework mapped against pre-trade rule set
Section 4
Integration Readiness
- FIX connectivity: all venues listed, FIX version confirmed, certification timeline confirmed
- Custodian position feeds confirmed: format, frequency, cutoff times
- Accounting system interface spec confirmed: trade booking feed, reconciliation workflow
Section 5
Organizational Readiness
- Executive sponsor identified with authority and availability confirmed
- UAT entry and exit criteria defined — configuration freeze before UAT start
- Parallel run period confirmed: minimum 4 weeks with defined go/no-go criteria
Sections 3–5 (Compliance, Integration, Organizational Readiness) + full score sheet — enter your email to download the complete PDF.
Get the full checklist →
Ready to turn the checklist into a scoped risk view?
If two or more sections land in Mostly Ready or Not Ready, the next step is not another worksheet. Use the $1.5K Risk Scan for executive triage, or the OMS Readiness Diagnostic when the implementation plan needs a full review.